Image credit: ArkEdge Space
01 · Challenge
The success of the AE1a mission depended on the reliable deployment of its VDES antenna once the satellite reached orbit. Without it, the mission could not progress toward validating two-way VDES communications.
ArkEdge Space sought a deployment mechanism that combined proven reliability with practical engineering advantages, and wanted to move beyond conventional burn-wire release systems to a resettable solution that supports efficient ground testing within an ambitious schedule.
02 · Solution
ArkEdge Space selected Dcubed’s nD3PP Nano Pin Puller to release the VDES antenna in orbit. Repeated ground testing before launch gave the team confidence in a deployment event that could only happen once in orbit.
Together, these capabilities offered ArkEdge Space a reliable and test-friendly alternative to burn-wire deployment systems while supporting the program timeline.
03 · Result
In May 2026, AE1a successfully deployed its VDES antenna in orbit. An image of the deployed antenna was downlinked via test radio signals, confirming the deployment.
The milestone allows ArkEdge Space to advance toward validating two-way VDES communications in orbit and supports the development of a VDES satellite constellation for maritime communications. ArkEdge Space has selected Dcubed products for future satellite missions.
This takes ArkEdge Space beyond previous reception-focused demonstrations. The mission also demonstrates deployable antenna capabilities on the company’s standardized 6U satellite platform.
Beyond enabling a mission-critical deployment, the successful collaboration strengthened the partnership between ArkEdge Space and Dcubed. The confidence built through the successful in-orbit performance of the nD3PP Nano Pin Puller establishes the foundation for continued collaboration.
Customer Voice
The successful deployment of the VDES antenna aboard AE1a was an important milestone for our mission. Dcubed’s nD3PP Nano Pin Puller provided the reliability and testability required for this mission-critical deployment, while its resettable design enabled us to conduct repeated ground testing efficiently. We appreciate Dcubed’s support and look forward to building on this success through future satellite missions.
Ryohei TakahashiCo-CTO, Division Director, Space Infrastructure Division · ArkEdge Space
About the Customer
Your Next Mission
Tell us what you’re building and our engineering team will help you find the right solution.